Flood and Drought Management Tools

The challenges and experiences in developing multi-objective basin plans

Duration: 60 minutes

- Geoff Wright (Niras) and Børge Storm (DHI): Shire river basin, Malawi – challenges and experiences from the development of the multi-sectoral Shire River Basin Plan

- Sílvia Leirião (DHI): Basin planning application developed as part of the Floods and Drought project – objectives and demonstration